Skip to main content

Monday, March 19, 2018

Announcements

Posted: Monday, March 19, 2018

Walkway Closure: Bishop Hall - March 26-30

The east-west walkway north of Bishop Hall (between Bishop Hall and the Campbell Student Union) will be closed from March 26 to 30 (spring break) to allow for the necessary investigation of water lines that require replacement as the Bishop Hall Renovation - Residence Hall Conversion project continues. Pedestrian access to Cleveland Hall will be available through the Campbell Student Union or via the east-west walkway south of Bishop Hall (campus map, PDF, 4.7 MB).

Bishop Hall will house about 200 students who are in the Honors Programs at Buffalo State, beginning in fall 2018. The residence will feature a state-of-the-art classroom with seating for 24 students, a multipurpose game room, study spaces, and laundry on each floor; free printing for honors students; and a building kitchen for students.

Please visit the Facilities Construction and Maintenance website for additional information about this and other construction projects on campus.

Submitted by: Lisa H. Krieger
Also appeared:
Thursday, March 22, 2018
Loading